Note
titleIncremental migration prerequisites

Incremental migration approaches require having both version 19.0 (SP3 or SP4) and 2021x Teamwork Cloud servers running.

Please contact your sales executive to get a temporal license key.


All in one go

You can migrate all the Teamwork Cloud database in one go. However, there will be downtime in production while data is being migrated from the source database ("esi" keyspace) to the target database ("twc" keyspace). This strategy may not be applicable if the source database is of significant size. During migration, the source database size increases by ~30-40% (the amount used by the new "twc" keyspace). However, after full migration, the old "esi" keyspace in the source database can be effectively dropped using the data manager command which leaves the database only with the "twc" keyspace.


The strategy of migrating the Teamwork Cloud database all in one go.

To migrate the Teamwork Cloud database all in one go


  1. Uninstall Teamwork Cloud 19.0 (SP3 or SP4).
  2. Install Teamwork Cloud 2021x.
  3. Launch the migration tools and perform full database migration.
  4. Drop the "esi" keyspace in the source database using the Data Manager.


Incremental migration using separate servers

You can migrate the Teamwork Cloud database incrementally by using separate database servers. This way users can continue working on the production server while the migration is in progress with only a minor downtime for the final migration step.


The strategy of an incremental Teamwork Cloud database migration by using separate database servers.


To migrate the Teamwork Cloud database when a single-node Cassandra cluster is used


  1. Install Cassandra 3.11.x on an external (migration) server.
  2. Remove data and commit logs on the migration server by executing the following commands:

    Code Block
    nodetool drain
    systemctl stop cassandra
    rm –fr /data/data/*
    rm -fr /logs/commitlog/*
  3. Perform the initial move of data from the production (source) database to the migration server without stopping work on the production server. To do this, execute the following command on the production server:

    Code Block
    rsync –av /data/data/ user@target:/data/data/
    Note
    titleNote

    In the command above, user is the OS user of the migration server and target is the migration server address.

  4. Carry out the final data move from the production database to the migration server while temporarily stopping work on the production server. After you finish, the migration server will have the entire data of the production database (the "esi" keyspace). To do this, execute the following commands on the production server:

    Code Block
    nodetool drain
    systemctl stop cassandra
    rsync –av /data/data/ user@target:/data/data/ --delete
    Note
    titleNote

    In the commands above, user is the OS user of the migration server and target is the migration server address

  5. Install Teamwork Cloud 2021x on the migration server. The "twc" keyspace will be created.
  6. Launch the migration tools on the migration server and perform initial database migration. Users can continue working on the production server as usual.

    Note
    titleImportant

    When performing initial database migration, make sure that the Remove resources after successful migration check-box is cleared in the resource migration wizard. For more information, see step 6 in Migrating database.

  7. Carry out the final production database migration while stopping work on the production server:
    1. Stop Teamwork Cloud services on both the production and migration servers.
    2. Stop Cassandra services on both the production and migration servers by executing the following commands:

      Code Block
      nodetool drain
      systemctl stop cassandra
    3. Move the newly created data from the production database to the migration server. To do this, execute the following command:

      Code Block
      rsync –av /data/data/esi/ user@target:/data/data/esi/ --delete
      Note
      titleNote

      In the command above, user is the OS user of the migration server and target is the migration server address.

    4. Restart Cassandra and Teamwork Cloud 2021x on the migration server.

    5. Perform the final migration of the newly created production data in the migration server.

    6. Make a backup of the "esi" keyspace on the production server.

    7. Drop the "esi" keyspace and remove the "esi" directory with commit logs by executing the following commands in the production server:

      Code Block
      nodetool drain
      sudo systemctl stop cassandra
      rm –fr /data/data/esi/*
      rm -fr /logs/commitlog/*
    8. When migration on the migration server is finished, drop the "esi" keyspace in the migration server database by executing the following command:

      Code Block
      nodetool flush
      cqlsh
      drop keyspace esi;
      exit
      nodetool clearsnapshot -- esi
    9. Move migrated data from the migration server to the production server by executing the following command on the migration server:

      Code Block
      rsync –av /data/data/ user@source:/data/data/
      Note
      titleNote

      In the command above, user is the OS user of the production server and source is the production server address.

  8. Uninstall Teamwork Cloud 19.0 (SP3 or SP4) on the production server.

  9. Install Teamwork Cloud 2021x on the production server.



Warning
titlePrerequisites

The following strategy is only applicable when the Cassandra node count in the cluster equals the Replication Factor (RF), for example, 3 Cassandra nodes with RF=3.


To migrate the Teamwork Cloud database when the production server is a multi-node Cassandra cluster and the migration server is a single-node Cassandra cluster


  1. Install Cassandra 3.11.x and Teamwork Cloud 19.0 (SP4 or SP3) on an external (migration) server to create the v19 database schema.
  2. Uninstall Teamwork Cloud 19.0 (SP4 or SP3) on the migration server.
  3. Stop Cassandra service on the migration server.
  4. Perform the initial data move from the production (source) database to the migration server without stopping work on the production server. To do this, execute the following command in any cluster node on the production server:

    Code Block
    rsync –av /data/data/esi user@target:/data/data/esi-new
    Note
    titleNote

    In the command above, user is the OS user of the migration server, target is the migration server address, and esi-new is a temporary production data location on the migration server.

    Ensure that the user has the write permission in the esi-new directory.

  5. Carry out the final data move of the production database while stopping work on the production server:

    1. Stop Teamwork Cloud services on both the production and migration servers.

    2. Execute the following commands on any of the production database Cassandra cluster nodes:

      Code Block
      nodetool repair
      nodetool flush
      nodetool drain
    3. Stop Cassandra services on all cluster nodes of the production server.

    4. Copy the remaining newly created data from the production server to the migration server. To do this, execute the following command on any of the production cluster nodes:

      Code Block
      rsync –av /data/data/esi/ user@target:/data/data/esi-new/ --delete
      Note
      titleNote

      In the commands above, user is the OS user of the migration server, target is the migration server address, and esi-new is a temporary production data location on the migration server.

  6. Restart Teamwork Cloud and Cassandra on the production server so that users could continue their work.
  7. Slip-stream the data from the "esi-new" keyspace to the "esi" keyspace on the migration server by running the convert_esi.sh script. Now the migration server has the current data of the production database (the "esi" keyspace).
  8. Install Teamwork Cloud 2021x on the migration server. The "twc" keyspace will be created.

  9. Launch the migration tools and perform initial database migration. Users can continue working on the production server as usual.

    Note
    titleImportant

    When performing initial database migration, make sure that the Remove resources after successful migration check-box is cleared in the resource migration wizard. For more information, see step 6 in Migrating database.

  10. Carry out the final move of the data that was newly created since the previous migration iteration from the production server:

    1. Stop Teamwork Cloud services on both the production and migration servers.

    2. Execute the following commands on any of the production database Cassandra cluster nodes:

      Code Block
      nodetool repair
      nodetool flush
      nodetool drain
    3. Stop Cassandra services on all cluster nodes of the production and migration servers.

    4. Copy the newly created data from the production server to the migration server while stopping work on the production server. To do this, execute the following command on the production server:

      Code Block
      rsync –av /data/data/esi/ user@target:/data/data/esi-new/ --delete
      Note
      titleNote

      In the commands above, user is the OS user of the migration server, target is the migration server address, and esi-new is a temporary production data location on the migration server.

    5. Re-run the convert_esi.sh script on the migration server to slip-stream data.

    6. Restart Cassandra and Teamwork Cloud 2021x on the migration server.

    7. Perform the final migration of the newly created data moved from the production server.

      Note
      titleImportant

      When performing final migration, make sure that the Remove resources after successful migration check-box is selected in the resource migration wizard. For more information, see step 6 in Migrating database.

  11. On the production server, start Cassandra nodes and make a backup of the "esi" keyspace.

  12. Drop the "esi" keyspace and remove the "esi" directory with commit logs by executing the following commands:

    Code Block
    nodetool flush
    cqlsh
    drop keyspace esi;
    exit
    nodetool clearsnapshot -- esi
    Note
    titleNote

    With the Cassandra service stopped, the "esi" directory and commit logs need to be removed on each of the production nodes by executing the following commands:

    rm –fr /data/data/esi/*
    rm –fr /logs/commitlog/*
  13. Uninstall Teamwork Cloud 19.0 (SP3 or SP4) on all the nodes of the production server.

  14. Install Teamwork Cloud 2021x on the production server to create the "twc" keyspace and initial database schema on all cluster nodes.

  15. With Teamwork Cloud, Authentication server, and Web Application Platform being shut down, execute the commands below, then stop Cassandra.

    Code Block
    nodetool flush
    nodetool drain
  16. Move the migrated data from the migration server "twc" keyspace to every node of the production cluster by executing the following command on the migration server:

    Code Block
    rsync –av /data/data/twc/ user@target:/data/data/twc-new/
    Note
    titleNote

    In the command above, user is the OS user of the production server, target is the production server address, and twc-new is a temporary production data location on the production server.

    Ensure that the user has the write permission in the twc-new directory.

  17. Start Cassandra and run the create_migration_table.cql script by executing the commands below. If needed, enter the required credentials to ensure successful cqlsh connection. This will create an empty table on the production server.

    Code Block
    cqlsh
    SOURCE '/opt/create_migration_table.cql'
    exit
  18. Stop Cassandra on all nodes of the production server including Teamwork Cloud by executing the following commands:

    Code Block
    nodetool flush
    nodetool drain
    systemctl stop Cassandra
  19. Slip-stream data from the "twc-new" keyspace to the "twc" keyspace in every node of the production cluster by running the convert_twc.sh script.

  20. Power up Cassandra and Teamwork Cloud 2021x services in the production cluster.


Incremental migration using one server

You can migrate the Teamwork Cloud database incrementally using the same server for Teamwork Could 190 (SP3 or SP4) and Teamwork Cloud 2021x. This strategy requires no downtime, but you may experience reduced Teamwork Cloud 19.0 (SP3 or SP4) performance during migration due to additional Cassandra load. After finishing migration, the source database can be dropped by using the Data Manager.


The strategy of an incremental Teamwork Cloud database migration using the same server for Teamwork Cloud version 19.0 (SP4 or SP3) and 2021x.

To migrate the Teamwork Cloud database incrementally using one server


  1. Install Teamwork Cloud 2021x on the same server where Teamwork Cloud 19.0 (SP3 or SP4) is running.

    Note
    titleImportant

    It is recommended to use the Teamwork Cloud 2021x no-install package to avoid Teamwork Cloud 19.0 (SP3 or SP4) services being overwritten.

  2. Change the ports of Teamwork Cloud 2021x and the Authentication server. For more information, see Setting a server port and Authentication server deployment on Windows and Linux.

    Note
    titleNote
    You cannot start Web Application Platform if another instance of Web Application Platform is already running on the same server. In this case, apply the Teamwork Cloud 2021x license via REST API.
  3. Launch the Teamwork Cloud 2021x service. Make sure that both Teamwork Cloud 19.0 (SP3 or SP4) and Teamwork Cloud 2021x are running.
  4. Launch migration tools and perform initial database migration.

    Note
    titleImportant
    • When entering the Teamwork Cloud 2021x server address in the resource migration wizard, use the <IP>:<PORT> pattern to take into account the change of the default port.
    • When performing initial database migration, make sure that the Remove resources after successful migration check-box is cleared in the resource migration wizard. For more information, see step 6 in Migrating database.
  5. At a chosen point in time, stop the Teamwork Cloud 19.0 (SP3 or SP4) service to prohibit the creation of new data and execute the final migration iteration.

    Note
    titleImportant

    When performing the final migration iteration, make sure that the Remove resources after successful migration check-box is selected in the resource migration wizard. For more information, see step 6 in Migrating database.

  6. Once the migration is finished, drop the "esi" keyspace by using the Data Manager.


Incremental migration using separate servers and one Cassandra instance

You can migrate the Teamwork Cloud database incrementally with Teamwork Cloud 19.0 (SP3 or SP4) and Teamwork Cloud 2021x running on different server machines, but pointing to the same Cassandra instance. This strategy requires no downtime, but you may experience reduced Teamwork Cloud 19.0 (SP3 or SP4) performance during migration due to additional Cassandra load.


The strategy of an incremental Teamwork Cloud database migration when Teamwork Cloud 19.0 series and Teamwork Cloud 2021x are on separate servers but point to the same Cassandra instance.

To migrate the Teamwork Cloud database incrementally using separate servers and one Cassandra instance


  1. Install Teamwork Cloud 2021x on a separate migration server.
  2. Point Teamwork Cloud 2021x to the Cassandra database server holding Teamwork Cloud 19.0 (SP3 or SP4) data by specifying an appropriate Cassandra seed node address in the Teamwork Cloud application.conf file.
  3. Deploy the Teamwork Cloud migrator application on the migration server and point it to the Cassandra database server holding Teamwork Cloud 19.0 (SP3 or SP4) data by specifying an appropriate Cassandra seed node address the database migrator application application.conffile.
  4. Launch the migration tools and perform initial database migration.

    Note
    titleImportant

    When performing initial database migration, make sure that the Remove resources after successful migration check-box is cleared in the resource migration wizard. For more information, see step 6 in Migrating database.

  5. At a chosen point in time, stop the Teamwork Cloud 19.0 (SP3 or SP4) service to prohibit the creation of new data and execute the final migration iteration.

    Note
    titleImportant

    When performing the final migration iteration, make sure that the Remove resources after successful migration check-box is selected in the resource migration wizard. For more information, see step 6 in Migrating database.

  6. Once the migration is finished, drop the "esi" keyspace by using the Data Manager.
  7. Uninstall Teamwork Cloud 19.0 (SP3 or SP4) on the production server and install Teamwork Cloud 2021x. At this point, the migration server is no longer needed.