The Planning Assumptions (C8) table identifies and describes assumptions that have been made for the implementation of capabilities.


To add a new Strategic Constraint to the C8 table


  1. Click the Add New button. The new row is added.
  2. In the Applies To cell, click Editand in the Select Subject Of Strategic Constraint dialog, choose the needed constrained Capabilities.
  3. Click OK.
  4. In the Rule Specification cell, click Editand in the Specification dialog, select the language and specify the body.

    The Rule Specification can be defined in English as well as using expressions or formulas (OCL).


To add an existing Strategic Constraint


  1. Click the Add Existing button. 
  2. In the Select Elements dialog, select Strategic Constraints. The filled row is added to the table. 

Generating a report

There is a predefined report for the C8 Planning Assumptions table.


To generate the report


  1. In the table toolbar, click Report.
  2. Select the location and type the name for the report file.
  3. Click Generate.